.gdpr{position: fixed; top: 0; bottom: 0; left: 0; right: 0; background: rgba(0, 0, 0, 0.7);color: #333;z-index:9999999;line-height:1.3;height: 100vh;width: 100vw} .gdpr_w{padding: 2rem;background: #fff;max-width: 700px;width: 95%;margin: 5% auto;text-align: center;position:fixed;left: 0;right: 0;margin:10% auto;} .gdpr_t{margin-bottom:15px;} .gdpr_t h3{font-size: 30px;margin:0px 0 10px 0;} .gdpr_t p{font-size: 16px;line-height: 1.45;margin:0;} .gdpr_x {position: absolute; right: 24px; top: 16px; cursor:pointer;} .gdpr_yn{margin-top:10px;} .gdpr_yn form{display: inline;} .gdpr_yn button{background: #37474F;border: none;color: #fff;padding: 8px 30px;font-size: 13px;margin: 0 3px;} .gdpr_yn .gdpr_n{background: #fff;color: #222;border: 1px solid #999;} amp-consent{margin-left: 10px;top: 2px;width: auto;background: transparent;} .gdpr_fmi{ width:100%; font-size: 15px; line-height: 1.45; margin: 0; } #footer .gdpr_fmi span, .gdpr_fmi span { display: inline-block; } #footer .gdpr_fmi a{ color: #005be2; } @media(max-width:768px){ .gdpr_w{width: 85%;margin:0 auto;padding:1.5rem;} } @media(max-width:700px){ .gdpr_w{margin:0 auto; width: 85%;} } .gdpr_fmi a:before{ display:none; } .gdpr_w{width:100%;} .f-w-f2 { padding: 50px 0px; } footer amp-consent.amp-active { z-index:9999; display: initial; position: inherit; height:20px; width:100%; } body[class*="amp-iso-country-"] .amp-active{ display: contents; } #post-consent-ui { position: fixed; z-index: 9999; left: 45%; margin-top: 10px; top: 0; } amp-web-push-widget button.amp-subscribe { display: inline-flex; align-items: center; border-radius: 5px; border: 0; box-sizing: border-box; margin: 0; padding: 10px 15px; cursor: pointer; outline: none; font-size: 15px; font-weight: 500; background: #4A90E2; margin-top: 7px; color: white; box-shadow: 0 1px 1px 0 rgba(0, 0, 0, 0.5); -webkit-tap-highlight-color: rgba(0, 0, 0, 0); } .amp-logo amp-img{width:190px} .amp-menu input{display:none;}.amp-menu li.menu-item-has-children ul{display:none;}.amp-menu li{position:relative;display:block;}.amp-menu > li a{display:block;} /* Inline styles */ div.acss138d7{clear:both;}div.acss6012b{background:transparent url(https://spectacle.com.ng/wp-content/uploads/2023/12/FB_IMG_1701850741400-150x150.jpg) no-repeat scroll 0% 0%;height:150px;max-width:150px;}div.acss6bdea{color:#333333;font-family:Arial;font-size:12px;height:75px;}div.acssdbd01{background:transparent url(https://spectacle.com.ng/wp-content/uploads/2023/11/FB_IMG_16997805516792-150x150.jpg) no-repeat scroll 0% 0%;height:150px;max-width:150px;} .icon-widgets:before {content: "\e1bd";}.icon-search:before {content: "\e8b6";}.icon-shopping-cart:after {content: "\e8cc";}
Categories: News

Gov. Lawal Approves Construction Of 108km Magami To Dansadau Road

Governor Dauda Lawal has approved the construction of the 108km Magami to Dansadau road.

The construction was approved on Monday by the Governor, who presided over the Zamfara State Executive Council meeting at the Government House in Gusau.

A statement from the spokesperson for the governor, Sulaiman Bala Idris, revealed that the Magami to Dansadau road is for immediate action to address security concerns and prioritize the well-being of the affected people in the area.

The statement added that important issues, including budget performance, were discussed at the state Executive Council meeting.

“Governor Dauda Lawal presided over the Zamfara State Executive Council meeting yesterday.

“At the meeting, the governor approved the reconstruction of Magami to Dansadau road.

“The 108-kilometer road project, as outlined in the 2024 Budget, has made significant progress in which the Ministry of Works and Infrastructure obtained the Executive Governor’s consent to commence the due process for the award of contract and authorization and Certificate of no objection from the Bureau of Public Procurement (BPP).

“The Governor approved the contract award to Dantata and Sawoe Construction Co. Ltd, being the lowest responsive bidder and shortest contract duration of 18 months at N81,189,223,505.73.”

The major scopes of works outlined for the project are clearance to the limit of the construction area, total scarification of the existing deteriorated surface, removal of unsuitable material and replacement with approved quality material, provision of filter material at identified locations, provision of approved laterite fill to makeup levels, provision of different types of hydraulic structures including reinforced concrete drains at identified locations and provisions of access cover slabs.

The Spectacles

The Spectacle is an online news platform that covers Nigeria. We are your one-stop Nigerian portal for all Nigerian news – politics, education, Opinion and Zamfara current affairs

Recent Posts

Zamfara Government, Labour Unions Sign MoU on New Minimum Wage

The Zamfara State Government and the state chapters of the National Labour Congress (NLC) and…

1 month ago

Zamfara Workers Express Disappointment Over Minimum Wage Delay

In the ongoing dispute regarding the implementation of the ₦70,000 national minimum wage, Zamfara State…

1 month ago

Organised Labour, Cross River Govt Reach Agreement on ₦70,000 M’Wage

The Cross River State Government and Organised Labour have reached an agreement on the implementation…

1 month ago

Minimum Wage: Abia Replies NLC, Distances Self From Defaulting States

The Abia State Government has strongly refuted claims by the Nigeria Labour Congress (NLC) that…

1 month ago

Minimum Wage: LG Workers, Primary Teachers to Benefit as NLC Reconciles with Sokoto Govt

The Nigeria Labour Congress (NLC) Sokoto State Chapter has assured local government staff and primary…

1 month ago

NLC Confirms Ondo Workers to Start Receiving ₦73,000 M’Wage Next Week

The Ondo State chapter of the Nigeria Labour Congress (NLC) has assured government workers that…

1 month ago